Keywords: computational model, multi-horizon forecasting, parallel computational process, computational optimization, fault prediction, limited resources, time series, intelligent monitoring, cyber-physical systems
UDC 004.94:004.8
DOI: 10.26102/2310-6018/2026.62.11.004
The paper addresses multi-horizon fault forecasting for intelligent monitoring of engineering and industrial systems under computational and response-time constraints. The aim is to develop a coordinated computational method in which a common representation of the current system state is used to generate horizon-specific forecasting trajectories and support subsequent technical-state assessment. The proposed method combines shared input preparation with specialized forecasting trajectories: Seq2Seq-LSTM for 6- and 12-hour forecasting and Temporal Fusion Transformer (TFT) for 24-hour forecasting. After the common representation is formed, the trajectories are executed concurrently and their outputs are temporally aligned for unified system-state analysis. The method is experimentally compared with a sequential baseline using identical models, input data, and parameters on two hardware configurations: an NVIDIA Tesla T4 GPU and a CPU-only platform. The evaluation considers inference latency and forecasting quality. On the NVIDIA Tesla T4, concurrent execution reduces the critical model-inference time from approximately 22 ms to 17 ms, a reduction of approximately 23 %, while preserving the forecasting functionality of the considered trajectories. On the CPU-only platform, the sequential organization requires approximately 453 ms and the parallel organization requires approximately 585 ms, corresponding to a 29 % increase in the critical inference path. The results characterize the investigated computational configurations and provide a basis for low-latency multi-horizon monitoring under resource constraints, while highlighting the hardware-dependent nature of the observed latency reduction.
1. Dahe A., Stuchilin V.V. Usage of machine learning algorithms for fault detection and diagnostics in life support systems. Izvestiya Sankt-Peterburgskogo gosudarstvennogo tekhnologicheskogo instituta (tekhnicheskogo universiteta). 2024;(70):93–99. (In Russ.).
2. Mehdiyev Sh. On monitoring the technical condition and technological safety of functional elements of the cyber-physical infrastructure. In: Cybersecurity for Critical Infrastructure Protection via Reflection of Industrial Control Systems, 27–29 October 2021, Baku, Azerbaijan. IOS Press; 2022. P. 18–26. https://doi.org/10.3233/NICSP220029
3. Demidova L., Marchev D. Development of the forecasting model for the complex technical systems' failures time during the proactive maintenance using the recurrent neural networks' technology. In: Proceedings of the 2020 2nd International Conference on Control Systems, Mathematical Modeling, Automation and Energy Efficiency (SUMMA), 11–13 November 2020, Lipetsk, Russia. IEEE; 2020. P. 370–374. https://doi.org/10.1109/SUMMA50634.2020.9280781
4. Xiao X., Ma Z., Xu D., Liu J. Remaining useful life prediction method of product based on improved transformer and GRU. In: Proceedings of the 12th International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE 2022), 27–30 July 2022, Emeishan, China. IET; 2022. P. 1725–1729. https://doi.org/10.1049/icp.2022.3115
5. Gulomov Sh.R., Yusupov B.K., Kamilov Sh.Sh.U. Models and algorithms for solving problems associated with large amounts of data in the military sphere. In: Proceedings of the 2020 International Conference on Information Science and Communications Technologies (ICISCT), 04–06 November 2020, Tashkent, Uzbekistan. IEEE; 2020. https://doi.org/10.1109/ICISCT50599.2020.9351506
6. Benjelloun S., El Aissi M.E.M., Loukili Y., et al. Big data processing: batch-based processing and stream-based processing. In: Proceedings of the 2020 4th International Conference on Intelligent Computing in Data Sciences (ICDS), 21–23 October 2020, Fez, Morocco. IEEE; 2020. https://doi.org/10.1109/ICDS50568.2020.9268684
7. Pan H. Lightweight design and implementation of machine learning models in time series forecasting. International Scientific Technical and Economic Research. 2025;3(2):160–171. https://doi.org/10.71451/istaer2533
8. Zhadan A.A., Shynkarenko V.I. Modern methods and tools for working with time series. Science and Transport Progress. 2025;(4):142–154. (In Ukrainian).
9. Lim B., Arık S.Ö., Loeff N., Pfister T. Temporal Fusion Transformers for interpretable multi-horizon time series forecasting. International Journal of Forecasting. 2021;37(4):1748–1764. https://doi.org/10.1016/j.ijforecast.2021.03.012
10. García-Nava J.-L., Flores J.J., Tellez V.M., Calderon F. Fast training of a transformer for global multi-horizon time series forecasting on tensor processing units. The Journal of Supercomputing. 2023;79(8):8475–8498. https://doi.org/10.1007/s11227-022-05009-x
11. Lazcano A., Sandubete J.E., Jaramillo-Morán M.A. A comparative framework for multi-horizon time series forecasting: neural networks with adaptive preprocessing. Machine Learning with Applications. 2025;22:100781. https://doi.org/10.1016/j.mlwa.2025.100781
Keywords: computational model, multi-horizon forecasting, parallel computational process, computational optimization, fault prediction, limited resources, time series, intelligent monitoring, cyber-physical systems
For citation: Dahe A., Stuchilin V.V. A parallel computational process model for multi-horizon fault prediction in resource-limited conditions. Modeling, Optimization and Information Technology. 2026;14(11). URL: https://moitvivt.ru/ru/journal/article?id=2562 DOI: 10.26102/2310-6018/2026.62.11.004 .
© Dahe A., Stuchilin V.V. Статья опубликована на условиях лицензии Creative Commons Attribution-NonCommercial 4.0 International (CC BY-NS 4.0)Received 03.08.2026
Revised 27.10.2026
Accepted 10.11.2026